Abstract

In the event of a short circuit interruption it is still very worrying where there are still many problems with protection equipment that does not work properly. In field conditions, the transformer at GIS Karangpilang often fails to disconnect the feeder. Based on this incident, it will be discussed how to coordinate the relay between incoming and Lakarsantri feeders. The calculation results from the working time of the relay feeder are 0.3 seconds with the working time on the incoming part being 0.68 seconds. Based on data from GIS Karangpilang, the working time of the relay in the feeder section was 0.41 seconds and 0.69 seconds in the incoming section with a fault current of 4.5 kA showing good results. In the short circuit simulation results, the manual calculation data and the data obtained from the Karangpilang GIS are not much different, where the working time of the relay feeder is 0.11 seconds faster than the incoming working time, with a time of 0.7 seconds which is in accordance with the relay settings.

 

Author Biographies

Reza Sarwo Widagdo, Universitas 17 Agustus1945 Surabaya

 

 

Gatut Budiono, Universitas 17 Agustus1945 Surabaya

 

 

 

Hadi Tasmono, Universitas 17 Agustus1945 Surabaya

 

 

 

References

L. Parinduri et al., “Pembangunan Gardu Induk 150 KV di Desa Parbaba Dolok,” 2017.

A. S. Sampeallo, P. J. Fischer, and J. Teknik Elektro, “Analisis Gangguan Hubung Singkat pada Jaringan Pemakaian Sendiri PLTU Bolok PT. SMSE (IPP) Unit 3 dan 4 Menggunakan Software ETAP 12.6.0,” Jurnal Media Elektro, vol. VIII, no. 1.

F. Oktavian Suryaadmaja, S. Handoko, and B. Winardi, “Evaluasi Koordinasi Setting Relay Proteksi OCR Pada Jaringan Tegangan Menengah 20 kV PT. APAC INTI CORPORA Semarang dengan ETAP 12.6.0”

A. Siswanto, P. Aprilia, P. Santi, and T. Susanto, “Politeknik Negeri Cilacap Perbaikan Pengkabelan Trafo Arus pada REF (Restricted Earth Fault) dan SBEF (Standby Earth Fault) untuk Meningkatkan Selektivitas Kerja Relay.”

I. D. G. Agung, B. Udiana, I. G. Dyana Arjana, T. Gede, and I. Partha, “Studi Analisis Koordinasi Over Current Relay (OCR) dan Ground Fault Relay (GFR) pada Recloser di Saluran Penyulang Penebel,” Teknologi Elektro, vol. 16, no. 02, 2017.

K. M. A. Amrullah, R. Kurniawan, and G. B. Putra, Aplikasi Pemetaan Prediksi Lokasi Gangguan Hubung Singkat pada Saluran 20 KV Berbasis Website pada Penyulang Apel.

M. Irfaq and Z. Zulkarnaini, “Analisa Arus Hubung Singkat untuk Koordinasi Setting Relay Proteksi Incoming dan Outgoing pada Sisi 20 kV di Gardu Induk Solok.”

M. Ali, R. Rukslin, H. Nurohmah, Y. Arie Pambayun, and A. Zaini, “Rekonfigurasi Jaringan Distribusi Radial Di Penyulang Purwoasri Berbasis Modified Imperialist Competitive Algorithms (MICA),” J. FORTECH, vol. 1, no. 2, pp. 74–78, Aug. 2020, doi: 10.32492/fortech.v1i2.227.

I. Safitri, dan Agus Adhi Nugroho, P. Studi Teknik Elektro, F. Teknologi Industri, U. Islam Sultan Agung Semarang, and J. Raya Kaligawe Km, “Analisa Koordinasi Setting Proteksi Over Current Relay (OCR) Outgoing 20 kV dan Recloser pada Trafo II 60 MVA Feeder RBG 01 di Gardu Induk 150 kV Rembang”

M. Pujiantara, T. Rizki Firdausi, V. Raki Mahindara, and V. Lystianingrum, “Setting Differential Relay Transformer (87T) dengan Pertimbangan Vector Group pada PLTU Tenayan 2x110 MW,” J. FORTECH, vol. 2, no. 1, pp. 29–39, Feb. 2021, doi: 10.32492/fortech.v2i1.237.

Downloads

Published

2021-09-23

How to Cite

Sarwo Widagdo, R. ., Budiono, G. ., & Tasmono, H. . (2021). Analisa Koordinasi Proteksi Feeder Lakarsantri pada Transformator II 50 MVA GIS Karangpilang. Jurnal FORTECH, 2(2), 69–75. https://doi.org/10.56795/fortech.v2i2.206